29.3.09
Sunday 'final thoughts'...
"As the groups wrap up individual designs and we begin prototype construction, the pace in the lab changes from relaxed to frantic. All of the major decisions have been finalized, and work for the open house has been divided up with 3 teams; sketchup, presentation and construction. Tasks for the open house for set up, presentation and take down have been divided up amongst group members.
In our final week of preparation, we hope to complete all aspects of the model including a list of features and information for all lab members to aid them in preparation. The groups are no longer working in their original groups."
image layout:
Black D
image link:
http://www.inhabitat.com/wp-content/uploads/linx_2.jpg