Team goals + dates and deadlines


The team goals of one of the labs:
-Costing: create a very rough cost estimate based on very little information (23/03/09)
-Costing: format an Excel spreadsheet to manage and evaluate data (25/03/09)
-Architecture: finalize design choices (23/03/09)
-Architecture: have costing to set budget limitations on design (25/03/09)
-Project Management: Finalize new contract and have it signed (23/03/09)
-Project Management: Hold a meeting to finalize remaining lab decisions (23/03/09)
-All: Submit information for updated Gantt chart (25/03/09)
-Civil: Determine possible forces which could affect the integrity of the building (25/03/09)
-Civil: Familiarization of buildings with similar construction processes and methods (25/03/09)
-Interior Design: Acquire a rough spending cap from costing (23/03/09)
-Interior Design: Design Kitchen and Living Room Spaces for each potential floor layout (25/03/09)
-Sustainability: Familiarization regarding sustainable landscaping practices (23/03/09)
-Sustainability: Find energy efficient appliances which coincide with the room designed by Interior Design: (23/03/09)
-Urban Planning: Determine building regulations and community standards for Varsity (25/03/09)
-Urban Planning: Have researched regulations and community standards implemented Architecture’s and Civil’s design.
-Complete Interim Reports (25/03/09)